Service of the Infiniti QX4 since 1996 of release
1. Introduction
2. Maintenance instruction
3. Routine maintenance
4. Engine
5. Cooling system and heating
6. Feed and control systems
7. Systems of start and charge
8. Transmission line
8.1. 4-staged automatic transmission
8.1.1. General information
8.1.2. Failure diagnostics of AT - the general information
8.1.3. Electronic and hydraulic control system of 4-staged AT
8.1.4. Removal and installation of transmission
8.1.5. Replacement of an epiploon of lengthening of transmission
8.1.6. Removal and installation of a cooler of ATF
8.1.7. Removal and installation of valvate assembly of a hydraulic contour of management of AT
8.1.8. Removal, check of a state and installation of a driving cable of blocking of switchings
8.1.9. Adjustment of the drive of switching of AT
8.1.10. Adjustment of the sensor switch of provisions of AT/permission of start
8.1.11. Capital repairs of AT
8.2. Transfer case
8.3. Differentials, power shafts / half shafts
8.4. Driveshafts
9. Brake system
10. Suspension bracket and steering
11. Body
12. Electric equipment
 






5d7aa768






8-1-6-snyatie-i-ustanovka-okhladitelya-atf.html

8.1.6. Removal and installation of a cooler of ATF


Details of installation of a cooler of ATF


Scheme of connection of lines of a path of cooling of ATF

 PERFORMANCE ORDER

    Remove a decorative front grille. Disconnect hoses from assembly of a cooler of ATF. Release fixture and remove assembly of a cooler. Remove a basic arm of a cooler of ATF. Release fixing collars and remove the hoses going from a cooler to a radiator and to transmission (see the illustration Scheme of Connection of Lines of a Path of Cooling of ATF). Turn out bolts of fastening of a basic arm of a tube of a cooler. Remove a hose assembled with a basic arm. Installation is made upside-down — track that all fixture was tightened a support with the required effort. In conclusion check the ATF level, in case of need make the corresponding adjustment (see the Head Routine maintenance).


"on the page back
8.1.5. Replacement of an epiploon of lengthening of transmission
on the following page"
8.1.7. Removal and installation of valvate assembly of a hydraulic contour of management of AT